There was so so much behind-the-scenes/walls work that went into the bathroom over the last 2 weeks. Brian and his various helpers installed all the new plumbing – that is plumbing for 1 toilet, 2 vanities, and 2 showers, as well as the appropriate venting to go with all of it.  They also ended up installing new electric as well as fixing and rerouting some existing. Whew!
So I don’t have a lot of that to show you, (although we are running all our new plumbing in PEX and it’s all controlled by this cool manifold which is like a breaker box but for your water. I should get Brian to help me post about that sometime) but I’ve got a few pictures of what the room looks like now.
bathroom - framing for medicine cabinets
These are the frame-outs for the future medicine cabinets. You can see the blue and red PEX plumbing as well as the white drains and vent pipe.  And all those lovely blue electrical boxes! I love DIY-ing this stuff because really, I need lots of outlets in a bathroom and I don’t want to argue with anyone about it. :)
bathroom - plumbing for toilet
Here’s where the toilet will go (like our chalk outline of it?). We had to build that little wall that will go behind it because it’s above the electrical breaker boxes in the basement, and you need so much clearance between the toilet drain and the breakers. Water + electricity don’t mix.
bathroom insulated
Here’s everything with new insulation, ready to be drywalled!
And just a side note – Brian took out this ceiling light box when he was re-doing the electric and I made him save it so I could take a picture.
electrical box with burnt wires
Those white wires coming out of the box are burnt, not dirty.  This is what happens when, for instance, you put 100 watt light bulbs in fixtures that are rated for 60 watts (or some other similar situation).  Of course, sometimes it’s hard to know because old fixtures didn’t necessarily have those safety stickers that new fixtures do, but those things aren’t jokes! If you want light brighter than the fixture is rated for, either use lower-wattage CFLs or LEDs or get a new fixture. You don’t want to risk burning things up in your ceiling!
Tomorrow morning, we are going to start working on the ceiling drywall. Brian is definitely renting a lift for that, so I’m excited to see how it goes.
Have a great weekend!

1 comment:

  1. Best Drywall Repair Services In Pennsylvania at Unleashed Painting LLC!
    Before painting, it is essential to ensure that the walls are in good condition to guarantee that the paint adheres for many years to come. If your walls are not in favoured condition then any paint can’t cover up the damage. Unleashed Painting offers Drywall Repair to aid the walls in holding up that paint for many years to come.

    ReplyDelete

Related Posts Plugin for WordPress, Blogger...